Construction Activity Report 7/27/07
Following nearly a week without air conditioning, I know this message
comes as most unwelcome news for those of you who must be in the law
building tomorrow, but we have just been advised by the construction
contractor that the water shut-down previously scheduled for earlier
this week is now set to occur tomorrow morning. Restrooms will be
locked and signage posted on the doors.
As with prior shut-downs, it is expected that the lavatories outside
the 401 Penn Street Classroom will not be affected. If this is
indeed the case, directional signage will be posted for access to the
401 Penn lavatories via the far northwest stairwell of the law
library (the stairwell is across the bridge and to the left).
John Podolski
Back to Building Page